May 3rd Clemson Historic Picture Of The Day

Construction Of The North Upper Deck In 1983


(Photos Uploaded By Alan Cutts)

Today’s photos are a series of shots during the construction of the North Upper Deck in 1983.

The North Upper Deck is comprised of 22,500 yards of concrete, 2,200 Tons of reinforcing steel, 3,000 tons of asphalt, 5,800 gallons of paint, and 60,000 pounds of aluminum seating

The North Upper Deck height is 13.36 stories and the length is 560 feet. The total cost of the North Upper Deck was $13.5 million

To illustrate the quality of the investment of the upper deck.  The $13.5 million dollar investment is recovered in just 3 years (7 home games per year) in ticket sales.  Each game Clemson sells out the North Upper Deck, over $600,000 goes towards Clemson Athletics.

The North Upper Deck is slightly larger than the South Upper Deck. The reason for this is simple. Engineers had more room to build behind the North Upper Deck than they did behind the South Upper Deck (with Cemetery Hill behind the South). This allowed for a slightly higher design, adding a few thousand more seats to the North.

At one time, Clemson promoted Death Valley as having the most sideline seats of any stadium in the nation. I do not know if that is still accurate, but you don’t hear Clemson promote that saying anymore so I assume that it is not.

If you have never been to the top of the upper decks at Clemson to watch a game, let me just say it is a unique experience!

(Note: If you have old pictures dating before 1990 that are Clemson related and you would like to share them, send them to me in an email with as much information about the picture as you can give and I will use it for a future “Clemson Historic Picture Of The Day”).